NAVD88とNGVD29標高基準面の変換ガイド

Convert elevations between NAVD 88 and NGVD 29 using NGS VERTCON regional approximations. Includes FEMA flood zone compliance notes and USACE engineering guidance.

NAVD88 (EPSG:5703) ↔/span> NGVD29 (EPSG:5702)

NAVD 88, NGVD 29 Converter

NGVD 29, NAVD 88 Converter

実務リスク警告

誤った測地系(データム)の指定や、グリッド・地上補正(Grid-to-Ground)を適用しない座標変換は、1〜400mの位置ズレを引き起こします。これは測量過失請求や施工紛争の代表的な原因です。

技術事例・判例を見る 契約上の測地系リスク リスク試算シミュレーター

技術背景:NAVD 88 vs NGVD 29

NAVD 88 (North American Vertical Datum of 1988, EPSG:5703) replaced NGVD 29 (EPSG:5702) as the official US vertical reference. The offset ΔH = H_NAVD88 - H_NGVD29 is not constant, it varies spatially and is computed by the NGS VERTCON tool from a dense grid of geodetic benchmarks.

Per NGS documentation, example values range from +0.202 m (+0.663 ft) in Oklahoma to - .267 m ( - .876 ft) in other regions. This non-uniformity is why a single constant conversion factor is professionally unacceptable for FEMA, USACE, or floodplain engineering work.

FEMA and USACE Compliance Requirements

USACE HQ guidance explicitly requires the use of VERTCON 1.0 for NGVD29NAVD88 conversion on flood projects, and mandates documentation of the relationship between project benchmarks and both datums. County-level FEMA partners (e.g., Lake County, IL) require the same VERTCON approach for all BFE (Base Flood Elevation) work.

Misapplying a constant offset or ignoring VERTCON can shift BFEs and structural design elevations by 0.2 to 0.5 meters —directly affecting freeboard, levee safety margins, and flood insurance classification.

Engineering and Legal Consequences

  • Structures built to the wrong BFE may fail regulatory minimums for 1% annual chance flood protection
  • Incorrect vertical datum in elevation certificates forces property owners into excess flood insurance premiums
  • FEMA investigations have documented properties wrongly in/out of flood zones due to vertical datum errors, subject to LOMA/LOMR disputes
  • Surveyors and engineers face professional negligence exposure when VERTCON compliance is not documented

Related Calculators & 事例研究

FEMA Flood Map Datum Mismatch Survey Risk シミュレーター Grid-to-Ground Calculator

技術FAQ

What is the formula for NAVD88 to NGVD29 conversion?

H_NGVD29 = H_NAVD88 - ΔH, where ΔH is the location-specific vertical datum shift from NGS VERTCON. For example: at 3610'N, 9840'W, ΔH = +0.202 m, so a NAVD88 height of 100.202 m converts to 100.000 m NGVD29.

Which vertical datum does FEMA use?

Modern FEMA FIRMs (Flood Insurance Rate Maps) are issued in NAVD 88. Older maps use NGVD 29. Always check the FIS (Flood Insurance Study) report header to confirm which datum applies to the specific FIRM panel you are working with.

Can I use a single offset for the whole US?

No. A single offset is professionally unacceptable. NGS VERTCON returns location-specific offsets based on a nationwide grid. Using a constant offset in FEMA or USACE work creates technical and legal liability.