Technical Specification Overview

ParameterStandard Value
Primary Geodetic DatumETRS89
Legacy/Historical DatumDHDN / PD83
Local Grid ProjectionGauss-Krüger
Known Datum Shift (vs WGS84)150 - 200 meters
National Mapping AuthorityBKG (Bundesamt für Kartographie)

Professional Compliance Warning

Failure to apply correct transformation parameters when converting from WGS84 (GPS) to ETRS89 creates a systematic 150 - 200 meters offset. In construction and legal surveying, this drift exceeds the allowable error margin for any certified geodetic workflow.

Open Germany Converter

Global Regional Network

United States Guide

NAD83 (2011) analysis.

View Hub

United Kingdom Guide

ETRS89 analysis.

View Hub

Australia Guide

GDA2020 analysis.

View Hub

Japan Guide

JGD2011 analysis.

View Hub

Canada Guide

NAD83 (CSRS) analysis.

View Hub